If you are getting quotes for a tiling job, the tiler day rate is often the number that decides who you hire. Most UK tilers work either to a day rate or a price per square metre, and knowing what a fair daily figure looks like helps you compare quotes without overpaying or, just as risky, picking the cheapest bid on a job that needs skill. This guide sets out what tilers charge per day in 2026, what pushes the rate up or down, and how to read a quote so you know exactly what your money buys.
What is the average tiler day rate in the UK?
Across the UK, a self-employed tiler typically charges somewhere between £150 and £350 per day. The wide spread reflects experience, region and the type of work. A straightforward wall or floor job in a smaller town might sit around £150 to £250 a day, while an experienced tiler doing detailed work, or one based in the South East, will often be at the upper end.
Location makes a real difference. A tiler in London and the surrounding commuter belt, including much of Bromley and South East London, usually charges £50 to £100 more per day than someone in the North or a rural area. Higher local wages, travel and parking, and simple demand all feed into that premium.
As a rough sanity check, a tiler covering roughly 5 to 8 square metres of standard wall tiling in a day at a £250 rate is charging the equivalent of around £30 to £50 per square metre in labour, which lines up with the per-metre rates most tradespeople quote.
Day rate versus price per square metre
Tilers price work in two main ways, and each suits a different kind of job.
- Price per square metre works well for large, simple areas such as an open floor or a full wall run with few cuts. You pay for the area covered, so the tiler carries the risk if the job runs slow.
- Day rate suits small, fiddly or unpredictable jobs: a splashback around sockets, a mosaic feature, cutting around a curved bath, or repairs where nobody knows what is behind the old tiles until they come off.
Small jobs almost always come with a minimum charge, often a half or full day, because a tiler still has to travel, set out and mix adhesive whether the area is one square metre or ten. If your job is tiny, expect to pay for a minimum call-out rather than a neat per-metre sum.
What affects a tiler’s day rate
Two tilers in the same town can quote very different figures for good reasons. The main drivers are:
- Experience and finish quality. A time-served tiler who leaves crisp grout lines, level large-format tiles and mitred edges commands more than a general handyman.
- Tile type and size. Large-format porcelain, natural stone and mosaics are slower and need levelling systems or sealing, so they push the effective rate up. Standard ceramic is quicker.
- Preparation and substrate. Tanking a wet area, fitting backer board or levelling a floor adds time that a bare day rate may not include.
- Access and site conditions. Upstairs bathrooms, tight spaces, no parking and no power all slow a job down.
- Pattern and layout. Herringbone, brick bond with offset cuts and borders create more waste and cutting than a simple grid.
What a day rate does and does not include
This is where quotes are easily misread. A day rate almost always covers labour only. Unless the quote says otherwise, it usually excludes:
- The tiles themselves, plus adhesive, grout, spacers, trims and silicone.
- Preparation such as removing old tiles, plastering, backer board or floor levelling.
- Waste disposal and skip hire.
- VAT, if the tiler is VAT registered (many sole traders are not).
Always ask a tiler to confirm in writing whether materials and prep are in or out. A £220 day rate that excludes two days of preparation is very different from an all-in figure that covers it. For a wider view of how labour, materials and room size combine, the independent Checkatrade tiling cost guide is a useful reference point.
How many days will your tiling job take?
Because most jobs are priced by the day, the timeline is really the cost. As a general guide for standard tiles fitted by one tiler:
- Kitchen splashback: half a day to one day.
- Small bathroom, walls and floor: around three to five days including grouting and sealing.
- Medium to large floor: one to three days depending on cuts and levelling.
- Full wet room with tanking: five days or more, as waterproofing needs to cure before tiling.
Grouting and sealing are often done the day after fixing so the adhesive can set, which is why even a small bathroom rarely finishes in a single visit.
How to compare tiler quotes fairly
When you have two or three quotes, put them on the same basis before you judge on price:
- Confirm whether each is labour only or all-in.
- Ask how many days each tiler expects, so a low day rate on a slow estimate is exposed.
- Check that preparation, trims and silicone finishing are included, not added later.
- Ask to see recent local work and photos of grout lines and edges.
The cheapest day rate is not the cheapest job if it comes with more days or a poorer finish that needs redoing. A slightly higher rate from a tiler who works cleanly and quickly often costs less overall.
Getting good value from a Bromley tiler
In Bromley and South East London, expect rates toward the higher end of the national range because of the London premium. That does not mean you cannot get value. Book several small jobs together to avoid repeated minimum charges, have the room clear and ready so no day is lost to prep you could have done, and buy tiles with a sensible 10 to 15 per cent overage so work is not held up waiting on more stock. If you want help planning a job or an idea of local pricing, our tiling guides and advice cover costs, materials and how to hire well.
Frequently asked questions
How much does a tiler charge per day in the UK?
Most UK tilers charge between £150 and £350 per day for labour, with £240 to £360 common for experienced tilers. Rates in London and the South East, including Bromley, tend to be £50 to £100 higher than the North.
Is it cheaper to pay a tiler by the day or per square metre?
For large, simple areas, per square metre is usually better value because you only pay for what is covered. For small or fiddly jobs, a day rate is fairer to both sides, though a minimum charge normally applies.
Does a tiler’s day rate include materials?
Usually not. A day rate is almost always labour only. Tiles, adhesive, grout, trims, silicone, preparation and waste disposal are typically extra, so always ask for the quote to state what is included.
How many days does it take to tile a bathroom?
A small bathroom with walls and floor usually takes three to five days for one tiler, including grouting and sealing. A wet room that needs tanking takes longer because the waterproofing must cure before tiling begins.
Why do tilers charge a minimum call-out for small jobs?
A tiler still has to travel, set out, mix adhesive and clean up whether the area is one square metre or ten. A half or full day minimum covers that fixed time, which is why tiny jobs rarely work out cheap per metre.